Past Work

Image

Tricore Labs

  • 184 holes drilled with 24″ and 36″ diameter
  • Hole depth varied between 56′ and 80′
  • Saved the general contractor money with only 10% overrun
  • Finished in 12 working days leaving the general contractor ahead of schedule

Abq Sunport Addition

  • 36″, 48″, and 60″ diameter holes drilled
  • Hole depth varied between 15′ and 40′
  • Some holes required temporary casing
  • All work was completed in a restricted area with limited working space
Image
Image

Tucumcari High

  • 220 holes drilled with 18″ and 24″ diameter
  • Hole depth varied between 15′ and 20′
  • Compact area with holes as close as 6″ from the existing building
  • Finished early leaving the general contractor ahead of schedule